Description: Concept development. Installation of engineering systems. Assembly of glass partitions. Installation of floor coverings. Refurbishment of terraces. Refurbishment of the territory
We have laid engineering networks in the floor and poured concrete on two levels of the floor to the design levels and are moving on to installing other engineering systems. At the same time, we are working with architects on the best solutions for interior materials.
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.